Screening distribution sites for interchange access before the drive

You've got eleven parcels on a shortlist, a travel budget that covers maybe four site visits this quarter, and a network strategy deck due in three weeks. The instinct is to start driving. Four wasted trips this quarter cost more than an afternoon spent cutting the list from a desk, and interchange access is usually what does the cutting.
Interchange access is the single variable that ends most distribution site conversations before they start. A parcel can have the acreage, the zoning, the power capacity, and still get cut because the nearest ramp is four miles out on a two-lane county road with a school zone in the middle of it. Catching that on a screen saves a trip.
What "interchange access" actually means on a parcel review
Ramp proximity isn't just a straight-line distance on a map. A parcel half a mile from I-80 can still be a bad fit if the only route to it runs through a residential collector with a 25 mph posted limit and a signalized intersection every two blocks. What you're actually checking:
- Distance from the parcel's frontage to the nearest interchange, measured along the road a 53-foot trailer would actually take, not the straight line between two points on a map.
- Whether that interchange has ramps in both directions, or whether it's a partial cloverleaf that only gets you onto the highway one way.
- The classification of the connecting road. A state-numbered truck route behaves differently than a county road that happens to be paved.
- How many at-grade crossings sit between the parcel and the ramp, including rail crossings, since a stalled train can turn a five-minute drive into a twenty-minute one.
None of this requires a drive-by to rule out. It requires a decent image of the parcel and the road network around it, and someone who knows what a bad merge looks like from above.
Reading road access and site context from a high-res pass
A current satellite image over the parcel tells you more than most people expect before they've looked at one with this question in mind. The existing curb cut shows up, or its absence does, which settles whether entitlement work even starts from zero. The frontage road either has a built-out turn lane or just a painted shoulder, and that difference is visible at 0.5 m resolution. Counting trailers parked at the warehouses within a mile gives a rough but honest read on how saturated that interchange corridor already is with freight traffic competing for the same ramps.
That last part matters more than people give it credit for. A parcel next to an interchange that's already got six distribution buildings pulling off the same two ramps during the morning dispatch window is a different proposition than one on a ramp with light existing logistics density. Both might clear the access check. Only one of them is going to feel that way at 7 a.m. on a Tuesday.
Building the actual shortlist
For a first-pass cut across a dozen or more candidate parcels, a strategy manager typically wants, per site:
- Straight-line and road-network distance to the nearest interstate or primary highway interchange.
- A land-cover read confirming the parcel is clear, graded, or at least not wetland or heavily wooded in a way that changes the site plan.
- A rough count of nearby logistics buildings, yards, or truck courts, as a density signal for how congested that corridor already runs.
- Visible access infrastructure: existing curb cuts, frontage roads, rail spurs if cold-chain or intermodal matters for the network.
None of that requires a windshield survey. It requires pulling imagery for each candidate and reading it with the right question in mind, which is exactly the gap between a twelve-site longlist and a four-site drive list.
Distribution Siting runs that pass on demand, parcel by parcel, so the sites that fail on access or sit in an already-crowded logistics corridor get cut before anyone books a flight to go look at them in person.
If the next step is narrowing a longlist down to the sites worth an actual visit, that's the exact problem this is built for.